Identify the part or product
Provide part numbers, descriptions, drawing revisions, models, assemblies, and any related specifications.
Manufacturing RFQ Guide
A complete request for quote gives suppliers the technical, quality, volume, and commercial information needed to price work accurately and identify potential risks early.
RFQ preparation
Incomplete quote packages force suppliers to make assumptions about material, inspection, finishing, packaging, tooling, and production volume. Those assumptions can produce misleading price comparisons and create problems after an order is placed.
RFQ checklist
Provide part numbers, descriptions, drawing revisions, models, assemblies, and any related specifications.
List grade, condition, certifications, approved equivalents, traceability, and customer-supplied material details.
Include prototype quantities, production releases, annual demand, forecast range, target dates, and delivery cadence.
Identify critical tolerances, datum structure, surface finish, inspection points, and special measurement methods.
Specify heat treatment, plating, coating, cleaning, marking, assembly, testing, and packaging.
Request first articles, inspection reports, certificates, capability data, traceability, or validation records.
Clarify tooling ownership, payment terms, freight, quote validity, minimum orders, and requested pricing breaks.
Common RFQ mistakes
Buyers should compare not only quoted prices, but also the assumptions each supplier used to create the quote.
Suppliers may quote different drawing versions or outdated requirements.
Prototype, lot, annual, and lifetime quantities may require different pricing models.
Coatings, plating, color, texture, masking, and appearance standards affect cost and lead time.
Special reports, testing, or gauges can add significant labor and equipment requirements.
Protective packaging, labeling, cleanliness, and pallet requirements may be overlooked.
Ownership, maintenance, replacement, storage, and transfer rights should be defined.
Material, tooling, validation, and secondary processes may determine the true schedule.
Quotes may differ in scope, quality controls, freight, tooling, or included services.
Once quotes are received, compare technical fit, quality, capacity, total cost, communication, delivery, and sourcing risk.
Supplier Selection Guide